FOR PROJECT MANAGERS

Mineral Resources' Onslow Iron

A case study on solving OSD (Over, Short, Damages) reports

Industry

Mining

Sites

1 location

Duration

6-month monitoring period

Mineral Resources' Onslow Iron
THE CHALLENGE

The Problem They Faced

OSDRs were slow, manual, and unreliable

CEM Alliance’s traditional Over Short Damages Report (OSDR) workflow created friction at the worst possible moment—when materials arrive and decisions need to be captured fast and accurately.

Contractors were required to fill out template documents (expected vs received quantities, damages, comments), duplicate information from delivery dockets, take photos separately, then convert everything into an electronic file and archive it in Share Drive.

That meant:

  • Double-handling (writing the same information multiple times)
  • Higher error rates from manual re-entry
  • Inconsistent evidence (photos and notes not always linked clearly to the right delivery/item)
  • Delayed reporting, which weakens claims, accountability, and follow-up actions

On top of that, once materials were on-site, storage location knowledge lived in people’s heads or scattered notes—making it painful to find items later, especially when time-critical construction work needed them.

the solution

What We Implemented

One capture on-site, searchable forever

To address the engagement challenges, we implemented a multi-faceted strategy. This included personalized content recommendations, interactive features, and a revamped user interface. By analyzing user behavior data, we tailored the experience to meet the needs of our audience. The results were remarkable, with a 30% increase in user engagement within three months.Piksort replaced the paperwork-heavy process with a single, simple on-site flow.

Contractors now:

  • Annotate the delivery docket once to confirm received quantities
  • If damage exists, capture photos immediately and add comments via tags in Piksort—on the spot, tied to the delivery
  • No retyping, no chasing files, no separate “admin step” to digitise and upload later

This immediately delivered:

  • Faster reporting with less friction on-site
  • Fewer errors by removing manual transcription
  • Stronger evidence because images, notes, and context are captured together in the moment

For CEM Alliance’s logistics team, Piksort also made it effortless to record short- and long-term storage locations of materials on-site. When construction teams needed an item, they could search the tagged materials in the portal and instantly see where it was stored, reducing delays, rework, and “where did that go?” downtime.

The Results

The Numbers Tell The Story

Client Report Prep Time

Before Our System

6 hours

per report

After Implementation

45 minutes

per report

Piksort has streamlined our OSDR process, greatly reducing administrative work and improving efficiency in both construction and logistics.

Daniel Hirsch

Site Manager at CEM Alliance

Check More Case Studies

See More
Mineral Resources' Onslow Iron

October 1, 2023

Mineral Resources' Onslow Iron

A case study on solving OSD (Over, Short, Damages) reports

Read More
Mining

Ready For Complete Project Documentation?

See how our system works for large-scale projects like yours.

See how the app works. We'll show you real projects, walk through the interface, and explain how to get